Frank Lill and Son is capable of handling projects of virtually any size, from a big plant with a small problem like emergency boiler repair, to renovating a 700-megawatt power plan, to the design, procurement and construction of a new 100 megawatt simple cycle generating station. Please review our prior projects and contact us with any questions.
Contact Frank Lill & Son today to discuss your power plant project!
Newington Energy CenterNewington, NH
550 MW Combined CycleTVA New Johnsonville Expansion ProjectNew Johnsonville, TN
320 MW Combined CycleGrays Ferry Cogeneration ProjectPhiladelphia, PA
173 MW Combined CycleMichigan Power CogenLudington, MI
128 MW Combined CycleCon Edison Expansion ProjectWest Springfield, MA
100 MW Combined CyclePinelawn Power Combined Cycle ProjectBabylon, NY
80 MW Combined CycleExelon New Boston StationSouth Boston, MA
Performed structural repairs and painted FT4A-7LF Gas Turbine Filter House. Repairs included sub-structure and replacement of floor, filter support grid frame, miscellaneous inlet duct repairs, as well as priming and painting of the entire filter house. Due to our response time for emergency outages and our quality of work, Frank Lill and Son is the preferred contractor at Exelon.Department of the Navy Portsmouth Naval ShipyardKittery, ME
Modernization and conversion of four existing 200,000lb ST/HR field-erected boilers in the Central Power Plant to fire natural gas and #2 fuel oil as the plant fuels in lieu of the existing #6 fuel oil. This project included the entire replacement of the boiler refractory settings in the boilers, installation of a new DCS Control System, all of which brings the plant up to current environmental air emission requirements for these new fuels.Fluor Constructors International, Ford River RougeDearborn, MI
Field erection of two Aalborg Industries HRSGs on two Frame 7FA Combustion Turbines. Project includes the erection of two 200' steel stacks.City of Holland, Ford River RougeHolland, MI
Furnished and installed a new Low NOx coal-fired burner system, including four new burners on a Combustion Engineering 300,000 lb ST/HR boiler at the Municipal Central Generation Station.GE Corp, TVA New JohnsonvilleNew Johnsonville, TN
General contractor in charge of all field construction, including mechanical, civil, and electrical for the installation of four GE Frame 7 Combustion Turbines. This project added over 320MW of additional power generating capacity to TVA's system.Frank Lill and Son Incorporated is a nationwide single-source prime contractor providing mechanical, electrical and civil engineering services to the power plant industry including nuclear, thermal, hydroelectric and renewable energy, and power transmission projects. Turnkey services on new power plant installations, maintenance, renovations, and retrofits include design and build projects, boiler erection, refractory, power plant process piping, breeching, dust collectors, baghouses and precipitators and control systems. Frank Lill and Son headquarters is in Webster, NY, a suburb of Rochester NY, and serves clients across the United States.